Tender Details
Tender Number: IDTKN26DOT002
Client: INDEPENDENT DEVELOPMENT TRUST KWA-ZULU NATAL
Closing Date & Time: 07/10/2025 12:00 pm
Status: Closed
Posted Date: September 15, 2025 12:51 pm
Posted By: Kwazulu Natal
Additional Information
CIDB Grading: 8 or higher
Category: Civil Engineering
Province: KwaZulu-Natal
Deposit Required: Yes
Deposit Value: R820.00
Deposit Refundable: No
Tender Description
THE CONSTRUCTION OF PONGOLA RIVER TRIBUTARY BRIDGE NO.4031 AND ROAD APPROACHES ON DISTRICT ROAD D9 BETWEEN KM 1.400 AND 2.120 IN THE UMKHANYAKUDE DISTRICT UNDER EMPANGENI REGION.Client Bank Account
A non-refundable bid deposit of R820.00 (Eight Hundred and Twenty Rands Only) payable in the bank account below by proof of deposit on collection of tender documents, is required. The IDT will only accept VALID PROOF OF PAYMENT in the form of a BANK DEPOSIT SLIP as an original as proof of direct payment into IDT bank account.
No cash payment will be accepted.
Bank: ABSA
Account Name: IDT Tender Deposits
Account Number: 408 494 0131
Branch Name: Corporate & Business Pretoria
Branch Code: 632 005
Reference: IDTKN26DOT002
The Independent Development Trust reserves the right to confirm/verify a transfer of a deposit amount into the IDT Bid Account before and/or after the issuing of a bid document.
Document Collection Address
The physical address for collection and closing of bid documents is the KwaZulu-Natal Regional Offices of the Independent Development Trust:
4th Floor, The Marine Building
22 Dorothy Nyembe Street
Durban
4000
IDT’s office hours are 08h30 to 17h00 weekdays only. Lunch hours are between 13h00 to 14h00
•Paying of bid documents will commence on the 12th September 2025 till the 19th September 2025 at 15h00 pm
•Collection of bid documents will commence on 16th September 2025 at 10h00 am to 15h00 each day and will close on the 19th September 2025 at 15h00 pm
Bidders must produce original proof of payment when collecting bid documents.
Site Inspection
Date & Time: 22/09/2025 11:00 am
Location: Meeting point on site on Road D9 at about km 1.350, and next to Nethezeka Primary School in Makhonyeni at the following co-ordinates 27°27'03.6"S 32°07'38.1"E, then proceed to the Phongolo River Tributary Bridge location.
